BM Trada approved anti-ligature & fire door installations
When it comes to installing anti-ligature and anti-barricade door sets in the mental health sector or any other sector, it’s critical to work with specialists like Mint Projects.
The installation of these doors requires a high level of expertise and attention to detail and Mint understands that each facility and its patients have unique needs, which is why they work closely with their clients to develop a customised solution that meets their specific requirements.
Mint Projects’ team of experts will assess the facility and recommend the best door system for the situation, ensuring that patients and staff members remain safe and secure at all times.
One of the most significant benefits of working with a specialist company like Mint Projects is their in-depth knowledge of SafehingePrimera products and anti-ligature and anti-barricade door sets.
Nationwide
Anti-ligature
Solutions
Nationwide anti-ligature & fire door contract maintenance
Transparent maintenance contracts.
We provide a nationwide “Health Check” service for anti-ligature and standard fire doors, which removes the worry and shoulders the responsibility of meeting current fire regulations.
Our Door Health Check packages are available in, Bronze, Silver and Gold standards, providing a flexible solution for the maintenance & performance of your anti-ligature and fire doors.
Working with NHS Trusts and Private Providers, we see life-saving doors not being maintained correctly as a specialist company every day. This could be because of insufficient knowledge of the products and product that has not been installed correctly from the start.
We have developed a Door Health Check and maintenance scheme to overcome this issue to ensure you meet current legislation.
For more details please use the below form.
Bronze
Attend the site, and survey each door on a door-by-door cost. Digitally collect all evidence using photographic and defect forms.
Provide a full report evidencing any failures and maintenance required and where required a comprehensive parts list.*
If required a comprehensive cost of materials and installation can be provided.
Silver
12/6 monthly maintenance contract, renewed every 12 months. Survey each door or ward contracted. Digitally collect all evidence using photographic and defect forms.
Provide a full report evidencing any failures, maintenance and materials required.
Provide costs from the approved contract.*
Gold
12/6 monthly maintenance contract, renewed every 12 months. Survey each door or ward contracted. Digitally collect all evidence by means of photographic and defect forms.
Provide a full report evidencing any failures, maintenance and materials required. Provide costs from approved contract. Emergency call out if required.*
* Where applicable travel time and over nights charged at extra